Using TIF to rebuild crumbling infrastructure in Stillwater

There are all kinds of planning tools with which cities have physically and strategically linked their downtowns to neighboring institutions or landmarks; whether they be a greenway axis, physical bridges, transit corridors. A TIF would be a new one in my experience, but not outside the realm of rational nexus due to the obvious necessity of financing more physical linkages.

The development scenario playing out in Stillwater, Oklahoma – home of Oklahoma State University’s flagship campus – is that of a large land grant university growing in spite of its college town, where development has generally not taken full advantage of the campus or other core opportunities. Stillwater has sprawled to the southwest, blanketing the hills of the Crosstimbers with residential neighborhoods, and to the northeast where strip malls and apartment complexes have spilled into the flat plains north of town. Downtown’s iconic Main Street corridor has benefited from revitalization a la preservation-minded developers and a retail-focused BID, while the surrounding blocks have visibly languished.

The entire core of Stillwater has languished with disinvestment and high renter-share due to typical college town housing dynamics. Landlords can rent out a minimally-maintained house for a premium, with no incentive to upgrade or invest for longer-term due to the transience of college tenancy. Stillwater has spent the last decade discussing options and ideas for revitalizing the core between campus and downtown, illustrated in the below aerial:

Screen Shot 2018-05-14 at 4.13.43 PM

While the downtown, shaded in blue, shows good density in the aerial and appears anchored along Main Street, activity and investment drops off sharply off of Main Street and even north of 6th Avenue along Main Street. The picture on the ground, illustrated below along 4th Avenue equidistant between campus and downtown, is even more stark:

Screen Shot 2018-05-14 at 4.23.48 PM

Further along Main Street itself, north of 6th Ave:

Screen Shot 2018-05-14 at 4.45.54 PM

Which we can compare to the healthier core of Main Street between 6th and 12th streets:

Screen Shot 2018-05-24 at 12.56.01 PM

Furthermore, where development is occurring, it can make surrounding deteriorated conditions and public infrastructure disinvestment all the more obvious:

Screen Shot 2018-05-14 at 4.57.07 PM

Screen Shot 2018-05-14 at 4.59.43 PM

Screen Shot 2018-05-14 at 5.00.10 PM

What’s happening in the above photos are classic examples development in spite of planning. REITs behind student housing developments have gotten religion on housing consumers wanting walkable, urban-styled housing; they are building this, despite the obvious lack of a walkable, urban-styled environment and supporting infrastructure.

As it stands today, the core between downtown and campus resembles both physical challenges and intrinsic challenges, the latter stemming from a lack of pride in a community that should do better as the state’s premier college town. The physical challenges involve housing conditions, lack of density, lack of sidewalks and those few that exist being in disrepair, general street conditions, and land that is likely unsuitable for development even if there were investment, which is instead occurring in new development areas on the edge of town. None of this is the fault of the city or any planners, who have for decades talked about walkability and trails/paths/streetscapes in this area, but lacked a funding mechanism to bring them to fruition. Now the private sector has given up waiting and is just moving in on the area without planning or coordination, and it remains to be seen how all of these mid-rise development will come together in the end. All of this forms the backdrop for Stillwater’s major proposed TIF.

5ad7cb8f0fc3b.image

A few key facts about this TIF, according to two Stillwater Newspress articles (article one, article two):

  • Covers a concise area generally representing the Main Street commercial corridor, surrounding downtown blocks, and everything between 6th Avenue and campus excluding the 6th Avenue commercial core
  • Runs until 2026 or 2027 according to Stillwater Newspress
  • Generates $32.5 million over lifetime, earmarked for physical improvements
  • Proposed Project Plan to be approved after TIF mechanism is approved, with already stated purpose of enhancing walkability and beautification
  • Stillwater Public Schools has City agreement for $5.6 million guarantee on top of state’s equalization funding formula, thus increasing net school revenue
  • County is proposed to forego $700,000 in theoretical property tax, and VoTech district $5 million, none of which is currently on tax rolls today
  • Projects must be consistent with Comprehensive Plan, Core Commercial Districts Plan (2005), and Corridor Redevelopment Plan (2012) all of which previously lacked funding mechanisms

While I believe that generally, the city should find mutually beneficial ways to achieve common goals like county-provided services and workforce development with the Meridian Technology Center, I look forward to seeing Stillwater bring some of its decades-long planning to fruition now with the assistance of a funding mechanism. I think generally, as a premier college town, Stillwater is a somewhat unique beast when it comes to property development, land use, community investment, provision of public services, and economic development – I think that the town-and-gown divide has prevented unity toward achieving all of these goals and getting them to work in tandem. While making everyone whole in the end, I look forward to seeing my college town find ways to finance long-term community investment.

This is not to say that I support TIFs in general, nor do I support or oppose the details here, but do believe this to be a worthwhile case study and a development scenario I intend to watch closely, while rooting for its success.

Conversely, I was in Denver last month, and had some time during a flight layover en route to Seattle to take the train downtown and explore. Denver has extended its iconic 16th Street corridor with bridges and tails that connect across the Platte Valley to the neighborhood across the Platte River and I-25. In doing so, they have created deliberate linkages that are visually and intuitively obvious, and seamlessly connected their downtown to areas of west Denver that previously felt disconnected. Doing this has not only improved west Denver, provided pedestrian access to economic opportunity in downtown, but also created billions of dollars of development opportunities in the Central Platte Valley, all anchored by these incredibly textbook connections.

Screen Shot 2018-05-14 at 5.06.13 PM

Screen Shot 2018-05-14 at 5.06.29 PM

Compare to the above development photos from Stillwater, and consider the long-term importance of infrastructure and human environment toward bringing planning goals to fruition. There are a lot of means to an end, and a TIF can accomplish a lot of means, but what is really the end goal, and how can a TIF truly elevate that?

In economic development, an often-missed point is that nothing is advanced in the long run by development for the sake of development.

Advertisement

Back home from Cleveland, Cincinnati, Nashville

It’s been a whirlwind of a week, which has kept activity on here to a minimum. I start an exciting new job, and consequently chapter of my life, this week. It is my hope that getting back to the 8-to-5 schedule will give me some time in between or in the evening to finish building out this website in a way that meaningfully contributes to revitalization planning.

Cleveland is always a gem. I’m not sure of the utility of signage to tell you that you’re obviously in the City of Cleveland, but the organic PR value of these signs have paid for themselves several times over.

IMG_5501IMG_5506

With and without photo editing, and signage. Considering the photo editing I used was just a few adjustments on Instagram, that gives us a representative sample of whatever is on the hashtag #Cleveland right now.

Cincinnati is also a gem. Being a Cleveland partisan, I suppose I’m supposed to rag on Cincy. Truth is it’s tough, especially with a streetcar! They were just doing testing when I was walking around OTR. FTA requires each of the 5 rolling stock to undergo 500 km (about 300 mi) of testing spread across different days and pedestrian/traffic/weather conditions.

IMG_5478IMG_5484IMG_5486

And then lastly, I recommend all revitalization-minded planners take a trip to Nashville sometime soon. You don’t have to take in the country music – there is plenty of other music, sights, and sounds – and above all, you really can just feel the energy and effort that goes into a city on the rise.

IMG_5483IMG_5487

The above photo is the Parthenon replica that was built to commemorate the centennial of Tennessee’s statehood, and the latter was my hotel view near downtown. The growing Nashville skyline comes with a westward gradient that often goes unseen in the city’s skyline postcards.

And lastly, the Columbus skyline view from my new loft’s rooftop deck! Always nice to come home to another emerging city, albeit the Most Normal City in America (really puts my travels in perspective once I come home).

IMG_5461

Probably some better angles of this view to come. It’s hard to really get in the groove on a realtor’s leash, who probably wouldn’t want me scaling the gutter for the perfect clearing/proportions/angles etc.

Mobility Grants Across Ohio

This has been a big week for bike and pedestrian mobility in Northeast Ohio, as the region’s dual urban cores both received small TIGER grants that will cement the place of bikes and pedestrians in the built environment. Cleveland’s winning TIGER proposal is more significant, with a number of new bikeways connecting the Near West Side including the long-awaited Red Line Greenway. Akron also now has the opportunity to complete its pedestrian promenade along the historic canal frontage that gave rise to the Rubber City.

Of course, these grants pale in comparison to the FTA SmartCity Challenge, for which Columbus will see a windfall of $150 million for displaced transit (driverless cars instead of transit). Even with awards of $5 and $8 million, Cleveland and Akron are still implementing “old school” transportation projects – the kind you can actually see and use.

ar-160729793This view of Akron’s Main Street, taken from a “loft” project I once worked on, shows the existing condition of Main Street, which is really fine. I think the back-in angled parking generally works. In Akron, you have a lot of blue collar folks who won’t be “fooled” by such newfangled parking contraptions, so it’s common to see a pick-up truck rebel and park front-facing on either the wrong side of the street, or across several spaces on the right side. The back-in angled parking is designed to reduce accidents from people backing out into traffic, and instead shifting the reversing to when people first park. It is smart, it works, and it improves safety. I hope they retain this feature, especially as people are just now getting used to it. The Akron proposal, which will ultimately cost $14 million including state and local funds, will also add a roundabout at Mill Street, which is needed. The roundabout will keep traffic moving through congested, one-lane downtown streets that legitimately do bottle-up.

11094642_gCleveland is getting a little more for its $8 million TIGER grant, sponsored by the Cleveland Metroparks, which has recently gotten much more involved in urban parks, waterfronts, and recreational connectors. The thrust of the grant is two bikeways, the Red Line Greenway (which has been in planning for almost 5 years) that will run adjacent to the Rapid, and the Whiskey Island Connector that connects downtown to the lake. The overall project totals $16.5 million, including funding from the state and foundations like the Gund Foundation, Cleveland Foundation, and Wendy Park Foundation. This project is a prime example of the type of catalytic community improvements made possible by bringing the non-profit sector into the TIGER effort, which wasn’t possible until recently.

The Red Line Greenway will serve as a legitimate form of transportation. It will nicely augment bikeways that are also underway (the dotted green lines) including completing the Towpath, on-street bikeway that will be added to W. 65th, and the “new” Shoreway. These latter additions will be served by two major connections also funded by this applications, including the Lakefront Bikeway Connector and Canal Basin Connector. The City of Cleveland is also still moving forward, albeit slowly, on the Lorain Avenue cycle track. All of this will turn the relatively-flat west side, which sits in the lakefront coastal plain, into a bikeable oasis (during warm months). This is one $8 million grant that will make a major, lasting difference in how Clevelanders get around and experience their community.

Now if we can just get the Lorain Avenue cycle track off the planning boards!

lorain-cycle-track-7ff24149ace3de40

 

An Ode to the Blank Slate

The Federal DoT created a program for cities without real transit to further-develop vehicle-based mobility alternatives with which they will then call themselves “smart” for doing so. In other words, DoT created the Columbus, Ohio grant program, and – Surprise! – Columbus, Ohio won it.

smartcitychallengefinalistsmap

I’ve written about the Smart City Challenge before, including when I came across a CityLab article that discussed this proposal along with possible mobility-oriented interventions in the Linden neighborhood (one of those interventions was my “Bus Box” proposal). I was pleasantly surprised to see Linden, a neighborhood for which I’ve done a lot of work, getting CityLab recognition. Now that the surprise is over, I am sorry to say, I am a little underwhelmed.

Columbus’ Winning Proposal

It’s complicated. To be fair, this application is about getting people moving, and not necessarily providing old-school “transit.” This grant is deliberately intended to pilot future technologies that should rightfully deviate from how transit is usually provided. That said, it’s also an awful lot of hoopla for a proposal that scrapes the bare minimum. This Wired article offers an excellent and unbiased (well, glowing) account of the full application, which will execute the following projects:

  • Autonomous vehicle pilot project to link currently non-accessible (via transit) employment centers
  • Mobility kiosks in the low-income Linden neighborhood, specifically geared toward pregnant women
  • Development of a universal transit pass that syncs with COTA (the bus authority), rideshare apps, taxis, and bikeshare

The real strength of the application was the local partnerships brought forth by Columbus’ determination to win this grant. A classmate of mine with an excellent blog detailed the following “total packages” among the 7 finalist cities, in order of leverage:

  • San Francisco: $150 million pledged by local partnerships
  • Columbus: $90 million pledged by local partnerships
  • Austin: $50 million of in-kind services pledged (which could be worthwhile coming from a tech hotbed)
  • Denver: “Total value of $84 million” (so an additional $34 million of leverage?)
  • Kansas City: $15 million pledged by local partnerships
  • Pittsburgh: Additional $11 million pledged by Commonwealth of Pennsylvania
  • Portland: None

Edge, San Francisco.

However, Columbus’ real advantage may have been the blank slate of transit offerings it currently boasts. We have a bus authority. San Francisco has BART which is underfunded but still excellent. Austin has commuter rail. Denver has one of the top LRT networks in the world. Kansas City just opened their new streetcar. Pittsburgh has the T, augmented by really cool “busways.” Portland has it all. DoT may have been attracted by the fact that a Columbus pilot offers the opportunity to implement “smart” technologies in an isolated environment, without cross-over influence of actual transit. As Gizmodo puts it: “Columbus will be able to demonstrate how a city which doesn’t have the time or capital to build out a massive rail network can use the next wave of transportation tech—autonomous vehicles, smartphones, sensors—to get residents moving in an efficient way that will get more cars off roads and lower emissions.”

Smart Challenges For Wicked Problems

Who’s to say Columbus doesn’t “have the time or capital” to build out a rail network? We won’t make time. It’s been a non-starter my entire time in Columbus.

For those that live, work, and get around in Columbus – what does the “Smart City Challenge” victory actually mean? If you’re not pregnant in Linden, what does this victory actually mean? Is everybody in Linden pregnant? What does an autonomous vehicle pilot project really do for a struggling built environment that needs placed-based, not dis-placed, solutions? Having a cool car that can pick you up for your OB/GYN appointment does little for job access, education access, creating recreational opportunities, and fostering passive walkability.

Having written a study on infant mortality in South Linden, I can tell you that lack of car ownership is not an environmental cause. Lack of mobility options, yes, car ownership – not exactly. The full gamut of factors contributing to this neighborhood’s unacceptably high infant mortality rates are:

  • Poor access to affordable and fresh food
  • High obesity rates vis a vis unwalkable environment
  • High stress resulting from crime, speeding traffic noise, and economic insecurity
  • The neighborhood’s only OB/GYN is across the tracks, on a site that was available on the cheap, for lack of resources to build a true neighborhood health center
  • Housing that is often riddled with environmental contaminants
  • Poor maternal care education (prevention of tragic accidents)
  • Other

Linden even has an underfunded BRT-lite project, in need of additional funding and wraparounds to qualify as true BRT, that this grant ignores.

For myself, I deliberately forced myself to use Columbus’ transit for the entire two years that I was in grad school. My thesis was on TOD, and to develop a sense of empathy and deeper understanding, I wanted to experience what it is like to actually rely on transit – too few planners have done this, in my opinion. I can tell you that being reliant on transit in Columbus is not fun. It means waiting for buses that are irregular (my outer backpack pouch has schedules for the #7, #18, #2, #8, and #21 – which I’m pretty sure are just suggestions), unpleasant and stressful, occasionally unsafe (frequent reports of LGBT discrimination and abuse), frequently broken down (I have had three COTA buses break down on me), and so on. For half of the year, add the bitter cold. During the warm months, the buses are often re-routed or indefinitely delayed due to frequent marathons, festivals, or parades on High Street. So while I don’t mean to be a fly in the ointment, I am very passionate about Columbus developing the first-rate transit it so badly needs, and this is not that.

This reminds me of the time I asked the otherwise-excellent outgoing mayor, Michael Coleman (a true role model of civic leadership, I must say) if Columbus was interested in pursuing transit to capture more development demand in the form of sustainable TOD, and his response was “Columbus is so TOD, we now have Car2Go!”

The Case for Real Transit in Columbus

The background context is that Columbus is a community that harbors deeply anti-transit sentiments. It’s a car culture. As Columbus has re-urbanized and more or less “gentrified-in-place” (raising density while developing true mixed-income), it has found auto workarounds. The city routinely grants TIF deals to cover the costs of parking garages to facilitate neighborhood redevelopment. The frustrating thing, as a planner, is that Columbus is a really great city that has what it takes to be “the next Great American City” (sound trumpets) a la Austin or Portland. Transit is the one disconnect – the stubborn pitfall that Columbus can’t get out of.

1922221_189815764686554_1363053789_n

The essence of Columbus is neighborhoods, which is ironic for a city best-known for its iconic commercial spine. Above is the most important photo you will ever see (to-date) of Columbus. Of course I am biased, because it is my own, but this photo illustrates better than I could describe the relationship between downtown, the “neighborhoods,” Ohio State, and the High Street corridor. Despite being such a linear city (not to be fooled by the radiating hub-and-spoke of sprawl, density levels and economic activity literally follow High Street) many voting citizens in Columbus pretend to be pro-transit, but just unsure of where it could go or who would use it. This oft-repeated refrain requires the above aerial study. If any city were ripe for a transit corridor, it is Columbus. You don’t need a Nelson Nygaard study (though we have that, too) to tell you where a rail corridor should go, just go up high and say “Eureka, I have found it!”

cbus.JPG What gives Columbus so much potential is that it is a vastly underrated historic city. Overshadowed by the former fourth-largest (Cincinnati in the 1800s) and fifth-largest (Cleveland in the 30s, 40s, and 50s) cities – Columbus falls for the notion that it too is not historic. On the contrary, Columbus is one of the most historic state capital cities, and features some of the most impressive Victorian-era neighborhood fabric anywhere in the United States. These historic neighborhoods are also dense, walkable neighborhoods. However, it is also best summarized as a collection of independent fiefdoms (unique neighborhoods or “villages”) that have spurned planning and transit to stave off the threat of connectivity to their surroundings. A great example of this is Clintonville, a truly wonderful neighborhood whose infamously NIMBY residents are either known as Clintonvillains or the Independent Republic of Clintonville. I truly empathize for any developer feebly attempting to build very high-end apartments for “those people” (you know, renters, like myself).

These fiefdoms are wonderful places. They’re walkable, charming, and valuable. They could be very transit-supportive. Columbus has an almost-endless list of them, from German Village, to Beechwold, from Franklinton (an emerging fiefdom), to Olde Towne East (shout-out to those OTENA gentrifiers, Flag Wars!) and the rest of the “Villages,” be they Victorian, Italian, Merion, and so on. Their calling card is that they all occupy inner-city locations without inner-city connectivity. While I adore cobblestone and brick-paved streets for aesthetic and sense-of-place arguments, I suspect they have been preserved so well to inhibit drive-through traffic.

The divisions of Columbus bring us to realities about inequeality and the geography of opportunity. The Kirwan Institute, based at Ohio State, is an excellent think tank dedicated to the study of poverty and urban inequality, and best-known for “opportunity mapping.” Their Columbus Opportunity Map, essentially a blended metric of quality of life and economic opportunity across Columbus census tracts, is viewable on Arc online. You have to open the filter control and turn off the neighborhood layer, which is just meaningless color-blocking, and turn on the neighborhood opportunity index. You will then see the following map for all of Franklin County:

cbus.JPG

While economic opportunity follows High Street, those who enjoy that economic opportunity do not cross High Street. To the east lies a sea of neighborhoods cut off from the city’s spine, by railroads, freeways, etc. These neighborhoods’ problems are largely due to issues with access, whether it be to jobs, education, healthcare, etc. We need a transit network that connects these neighborhoods to the economic spine of Columbus. On top of that, truly linking the diverse and multifaceted (and almost entirely densely-populated) communities that line both sides of High Street would catalyze additional economic potential by bridging the gaps wherever they exist.

Toward the Right Solution

m-1_20map-0Columbus just won $150 million of funding through an incredible public-private partnership. Cincinnati, Kansas City, and Oklahoma City are all building their modern streetcars (trams) for less than that. However, Columbus needs much more than a downtown circulator streetcar. Columbus needs something like the M-1 Rail, which I’ve covered extensively, which serves a true need by filling the gap and forging strategic connectivity. The 3.3-mile corridor, envisioned as the first phase, connects two currently-disconnected rail systems and makes the broader Detroit Transit Authority bus grid more efficient. Ran by the suburban RTA (SMART), the M-1 Rail will also link the two disparate transit authorities serving Southeast Michigan, and it will do so through a corridor that links all of the city’s major economic, cultural, and institutional assets.

The M-1 Rail is a slam dunk because it is the perfect place-based transit project. It was also made possible by significant private- and philanthropic-sector contributions, which covered most of the cost, in addition to about $45 million in FTA grants.

Sound familiar?

Columbus needs an M-1 Rail, whether that is “smart” or not – something that provides real, meaningful transit. Columbus does not need a ride here and there for expecting mothers – it needs a transit pipeline for everyone.

#ClevelandThatILove

Spent Memorial Day weekend up in Cleveland, and took a few photos of the city’s changing cityscape. This isn’t a comprehensive photo set, but rather just a few snapshots I came across over the course of a weekend. Click on the image for full-size and captions.

 

Lastly, no trip to Cleveland would be complete without watching the sun set over Lake Erie, this time through a thunderstorm (which intensified into a tornado warning).

13329200_1621662484791115_303765472_n

Challenging and Serving Detroit

cd3

While there is nothing unique about having a challenge, according to City of Detroit Chief Talent Officer Bryan Barnhill, the challenge of holistically revitalizing Detroit is unique and noble. Challenge Detroit is an exciting and innovative leadership and professional development program that brought me up to Detroit in Mid-May. Not only was it a great time to be in Detroit, with the best weather I have experienced there to date, but it was a truly inspiring program and mission.

cd1We were treated to a first-class, two-day program with one-on-one interviews with Detroit-area planning and design firms, networking events, guided bus tours of the city, field sessions with community stakeholders, and then a wrap-up “Mini-Challenge” to design a park around a vulnerable population. While the “Mini-Challenge” is designed to simulate service projects that Challenge Detroit Fellows undertake regularly, this “Mini-Challenge” was distinctly fun, giving us the opportunity to address a serious challenge with mediums such as play-doh, pipe cleaners, buttons, and popsicle sticks. My table, tasked with designing a park that is inclusive of homeless populations, produced a vision for a “Food Farm” park that addresses food insecurity through community gardens, a farmstand, and programming spaces.

cd2While I may still yet become involved in Challenge Detroit myself, there are some transferable values that could yield similar results for other cities. As the non-profit sector has been uniquely involved and empowered to work on Detroit’s systemic issues, a major point of emphasis is that it won’t be “fixed” or “solved” or even “helped.” The “solution” is something else. Toward this end, the program teaches a project planning philosophy called “Design Thinking,” adopted from Stanford University’s design school.

Backed by these non-profit stakeholders, Challenge Detroit is unique for bringing in top-notch talent and embedding them into the community that they will serve. Rather than “fix, solve, and help,” the idea behind Challenge Detroit is “live, work, play, give, and lead.” I think this bold idea emphasizes that while Detroit needs givers and leaders, it also needs every-day people who just want to live, work, and play. For 30 lucky fellows, the program also offers the opportunity to develop one’s career while serving this amazing mission in an amazing city.

1 Month: DC, PHI, NYC, PIT, CHI

Capture

My apologies to readers of this blog who may have noticed that I’ve slowed down; I intend to remedy this by uploading components of my thesis and also with a few planned articles to highlight lessons I’ve learned from this recent swarm of trips.

What I’ve been up to lately: Finishing and defending my thesis, graduating with my Master’s in City and Regional Planning, still working for a tax credit syndicator, following-up on Congressional lobbying efforts for Preservation Action, the inaugural convening of RBCoYP, and applying for jobs! Whew.

Here is a brief travel tease…

DC in Mid-March:

 

IMG_4555

 

Philly in Mid-March:

12519424_198377487207447_830096758_n

NYC in Mid-March:

12905122_1034111239982900_513234742_n

Pittsburgh in early April:

12935069_631739176973426_168404812_n

Chicago in mid-April:

12960181_197738590612652_82702512_n

No favorites! Besides the last city I’ve visited at the moment, whichever that is.

Design Ingenuity: Parks for the people

Design Ingenuity is a series highlighting teachable examples of urban design. The first Design Ingenuity post highlighted US Bank Stadium in Minneapolis, a transit-oriented stadium project. This is the second post in the series, detailing OKC’s major push to renovate as many inner city parks as possible. The goal of Design Ingenuity is to understand the difference that good design makes in the lives of city residents.

gp-overheaded-rendering

Tulsa’s $350 million new Gathering Place project is forcing OKC to up its ante with parks

Oklahoma City’s parks are a major opportunity for improvement. I have a tendency to belabor the point in trying to frame matters optimistically, but the reality is that parks are a core area in which OKC falls short. Not only do they not fully meet the needs of human-scale communities, but they also fail to attract residents who often drive to Tulsa or a state park for recreation. Driving over an hour for a park seems odd – but people do legitimately go up to Tulsa for the River Parks, Swan Lake, Woodward Park and the Tulsa Rose Garden, etc. Tulsa will be especially competitive for outdoor recreation enthusiasts once its new $350 million “Gathering Place” park (pictured above) is complete.

People like nice things. Parks and transit, really the two core areas where OKC lags behind, are both two of the most noticeable components of cities. OKC’s parks, besides the incomparable Myriad Gardens, have a ways to go. That said, OKC is aggressively addressing both transit and parks, and in some instances killing two birds with the same stone (trails and bike lanes accomplish both parks and transit).

On parks alone, OKC has 11 distinct initiatives currently underway. These 11 projects will collectively transform OKC’s public realm and get its residents outdoors. Great parks are finally well within reach for OKC. Of course, the plan behind all of this is the 2013 OKC Parks Masterplan. At the conclusion of this effort, OKC will go from trailing to leading other cities.

Myriad Botanical Gardens and Project 180

Project 180, begun in 2010 and scheduled to commence in 2014, but still underway and running behind schedule – is an aspirational $141 million facelift of downtown OKC’s public spaces, including the Myriad Gardens. The Myriad Gardens were designed by I.M. Pei and hadn’t been updated since, while surrounding streetscapes were similarly outdated. Funding was generated through a TIF district just on the $750 million Devon Tower, which didn’t need the TIF, but instead wanted updates to surroundings. P180 included bike lanes, street furniture, lighting, landscaping, and public art throughout the 180 acres of downtown.

The figurative result of Project 180 is a complete “180” turn in activating downtown’s outdoor spaces with people. The specific legacy though is increased attendance at the Myriad Gardens and a well-designed template that OKC is now applying to other streets, including in Film Row and Core2Shore.

“Central Park”

Just to recap: Most casual observers to planning and design are aware of OKC’s new MAPS 3-funded “Central Park” (it’s yet-to-be-named, and I’m pushing for Ellison Park or Ellison Green after the hometown literary great). $132 million total. The 40-acre north park (north of the new I-40 Crosstown Expwy) is scheduled to open in 2018, while the 30-acre south park is scheduled to open in 2021. The north park is a highly-programmed, emphatically-designed urban park, whereas the south park is a more-passive, heavily-landscaped link to the Oklahoma River. OKC Talk has detailed plans here. South Park is pictured below:

park020316b

Park architects, Hargreaves Associates, have also designed Chicago’s Millennium Park, Houston’s Discovery Green, Seattle’s South Union Lake Park, and Birmingham’s Railroad Park. Hargreaves has also given OKC a park template, based on this Central Park design, that OKC is applying to outdated parks across the city.

Military Park

This park was originally scheduled to be renovated along with Classen Boulevard’s Asian District streetscape, more than ten years ago. That didn’t happen at the time. At last, the 1.8 acre underutilized site at NW 25th and Classen Blvd is set for an ambitious makeover that will hopefully revitalize this stretch of Classen and the greater OCU area. The space has been named “Military Park” for nearly 100 years, and incidentally has become one of the nation’s most concentrated Vietnamese communities. As such, the park will feature a Vietnam War memorial along with several tributes to what Vietnam means as a homeland.

Woodson Park

SP-1

This large park, originally one of the corners of Grand Boulevard, was sliced in half by a freeway and then disinvested for decades. This project refreshes the western half of the park, which had been really disinvested and cut off from the surrounding neighborhood. $5.2 million from the 2007 General Obligation Bond.

McKinley Park

cauedmtucaa6-zx

Not a total park renovation, but a flashy new coat of paint no less for the rec center at McKinley Park, in the Classen-Ten-Penn neighborhood. As CTP has become a community development focus neighborhood, the goal here would be to generate creative synergies before the Strong Neighborhoods Initiative moves on to another neighborhood. This image is just from the call for artist submissions.

Boathouse Row

Boathouse Row now includes the original Chesapeake Boathouse, along with the OCU Devon Boathouse, the UCO Boathouse, the OU Boathouse, SandRidge Adventure Tower, and CHK Finish Line Tower. In addition to these philanthropic-supported projects, MAPS 3 has added $57 million in projects, the largest phase yet. The MAPS 3 improvements include racetrack improvements, grandstands, and the RIVERSPORT Rapids park.

Memorial Park

memorialparkplanview

Memorial Park, at NW 36th and Classen Blvd, is another park that used to be more historically significant and then faded. While it’s not ideal to tear down homes on 36th for parking for the park, the configuration allows more preservation of the original park, particularly the historic fountain fronting Classen. Very nice project for just $1.9 million, financed by the 2007 General Obligation Bond, completed in 2015.

Red Andrews Park

This park, historically an after-thought in between downtown and no-man’s land, has always been a problem. The Oklahoman couldn’t refrain from mentioning the park’s sordid park along with announcing its redesign. The new design takes parking out of the park, through a shared parking agreement with the new $10 million Valir Clinic across the street. It also lends it a definition of space that it previously never had.

Bicentennial Park

okcbiimagi_bicentennial_park

Civic Center Park or Bicentennial Park, same thing. Not sure which name it’s using right now, but this park encircles OKC’s Art-Deco civic center which includes City Hall, the Civic Center Music Hall (home to the OKC Philharmonic and Broadway shows), and backs to the OCPD HQ. As downtown withered in the 70s and 80s, the park became a dumping grounds for statues and plaques. I think there was a statue of every mayor, which is almost interesting. Rand Elliott, perhaps Oklahoma’s most acclaimed architect, completely overhauled the space in his recent renovation – funded by $3.5 million in Project 180 funds, similar to the Myriad Botanical Garden renovations. It’s a small space, but designed well-enough to feel significant.

In my opinion, as someone who actually opposed this redesign initially, I’m now convinced that Rand’s vision is what this space should have been back in 1930. The walking paths that elegantly fan out toward the edges remind me of the Chrysler Tower crown. I believe that’s called organic (organicist?) Art-Deco. Enhanced sight-lines in between the two similar WPA-style Art-Deco landmarks, as well as enhanced skyline views, also make a big difference. This is an Art-Deco park where such a thing should have always been.

Wheeler District + Park

Wheeler Park is OKC’s most historic park. It was an urban central park, a highly-programmed promenade, and amusement park rolled into one. One particularly damaging flood changed all of that. Then the Army Corps of Engineers came and dammed the Canadian River, and turned the former parkland into an urban prairie. The “river” literally had to be mowed twice a year. Developer and acclaimed designer Blair Humphreys has acquired the Downtown Airpark, across the river from Wheeler, and is planning to revive this neighborhood’s place in OKC. The first step was successful implementation of concert grounds to activate the site, and the second step (currently underway) is reconstruction of the Santa Monica Ferris Wheel on this site (purchased on eBay). It’s worth noting this entire project is privately-funded, though almost surely will involve a public partnership.

American Indian Cultural Center and Gardens (Smithsonian affiliate)

Definitely don’t want to get into this project’s history, but it is moving forward once again! This project, though dogged by delays, cost overruns, and political embroglio, will give OKC a world-class anchor for the south riverfront. It also solidifies the importance of American Indian culture, by placing this new landmark on the most visible, centrally-located site possible. Through an operating agreement with the Chickasaw Nation, the surrounding lands will be commercially developed while retaining the park-like setting. Also noteworthy – Hargreaves Associates once again, on the design (hence why the mounds bear resemblance to the Clinton Presidential Library grounds).

_________________________________

OKC needs parks. The city that I grew up in during the 90s had the level of park investment you would expect in Dodge City; Tumbleweeds blowing through was the only reliable programming. This was before the parks renaissance that nearly every city is experiencing, before the “back to the city” movement, and before OKC itself had discovered an innovative civic investment mechanism (the MAPS penny sales tax).

The design ingenuity of this endeavor though is its breadth. Rather than just complete a few really good parks, OKC has sought to use those projects to both inform and build capacity for doing more, as well as to build a toolset of templates that the city can plug and play with. This not only reduces design costs, but also administrative costs and process time. This is why almost all cities use a template approach for streets and open spaces – sometimes the templates are bad, but in this case the template OKC has built up to is pretty good in my opinion.

OKC can do this with a continued commitment to parks across the city, and not just concentrated downtown. These projects will rely on long-term commitments, for which the city will rely on partnerships with the surrounding community. Toward that end, it is important that these parks put people first.

Lastly, never bet against a city doing something it has already done before. OKC has had great parks before, and can do it again. It really is all about making a long-term commitment. Behold, Wheeler Park, of yesteryear:

 

Of course, it will help having a vision such as this for making critical connections into the future:

okc parks

Real Unclear Policy – The non-think tank

Adam Millsap, a research fellow at George Mason University in Virginia, has seen the efforts to revitalize rust belt cities and thinks Americans deserve to be told the truth. That “truth” is the basis for this screed on the Real Clear Policy website.

“Finally, we need to stop encouraging people to stay in declining areas based on stories of false hope. For certain individuals, it may make sense to remain in a depressed area, for either economic or personal reasons, but they should do so without being told that we can save their city. Moving toward opportunity is a better solution for most Americans than waiting for opportunity to come to them.

Never mind the transformation taking place in Detroit. Forget about the strong results that are starting to emerge out of Cleveland, where the city has surged into a leading position among cities competing for college-educated Millennials. Who cares that Pittsburgh and Boston have already proven that turnarounds are possible?

He and other George Mason researchers also aren’t impressed by the rust belt’s cost advantage, because they contend that SF and NY have “laws” that “artificially inflate” the cost of real estate. You know, zoning, building standards, and crazy things like that. That’s why those cities are so expensive, not because of demand.

You can’t make this up. And apologies to any George Mason people reading this, as I have friends myself from GMU, and would never blaspheme an entire school (let alone a good one). I am not trying to undermine the entire research arm of George Mason, let alone the public policy school, but just pointing out the trail of how they got to this point. Policy formulation precedes policy implementation.

“Yet residents are told that their cities, from Buffalo, N.Y., to Birmingham, Ala., can regain their former glory if they can just attract the right company or win that next government grant.”

I guess it’s that simple. Just waiting on that government grant to come through!

I’m not an abrasive, argumentative, or cantankerous guy; but I have to call out dangerous research such as this. He is right that individually, it is better to put yourself in proximity to opportunity. You can do that by moving across the street in every single one of these cities. My personal experience is that this region is bursting with opportunity, and that the secret is out – not unlike SF and NY, pursuing opportunity has gotten increasingly competitive here.

By all means, scare people away from the Rust Belt – makes life easier for me. However, when you attempt to inform federal investment priorities, and lead with an attack on our grant-winning efforts to compete against the federal investment flowing into the Sun Belt, that’s when Real Clear Policy crosses a line. You aren’t just looking out for the individuals mired in rust belt poverty, who you want to move down to become mired instead in Sun Belt poverty. This is a regional attack on another region.

I have always thought better to produce research on good unfunded grant proposals than bad grant winners; the emphasize needs to be on growing the pot for community development projects nation-wide, rather than shrinking the pot for all of us.

Meet the coolest transit project in America: M-1 Rail

Detroit, the city that refuses to die, and the city that got America moving, has gotten a little well-deserved help with their new streetcar. Detroit is long-known as one of those cities where transit projects go to die, with countless different iterations of this same project reappearing every few years. To this point, it’s worth mentioning that the People Mover system (photographed extensively in my 2016 trip) was always envisioned as a “last mile” circulator once people get downtown on a larger transit network that hasn’t materialized until now.

I don’t really know if this project is the coolest transit project in America. I’ll say it’s pretty unlikely. M-1 Rail is a mere $125-180 million endeavor, which puts it firmly in the New Starts realm, while more established transit cities like Seattle are doing crazy things like capping an entire urban freeway, LA is doing subway extensions, Atlanta is developing a copy + paste model for air rights construction over MARTA stations, Minneapolis wants 75,000 downtown residents, and Dallas fully intends to protect its claim to the most light rail of any city. These cities don’t blink at spending billions – yet Detroit’s little $125 million project has been such a topic of controversy. Vox’s Matthew Yglesias called it “The worst transit project in America.” It’s hard not to wonder if this is a cogent anti-streetcar argument or just thinly veiled annoyance that this city refuses to conform to the negative outside press. (I feel guilty even offering this up as click bait, but I still feel compelled to offer totally contrasting viewpoints.) If he can make such an unfounded claim, then surely I can counter that by calling it the coolest transit project in America. M-1 Rail brings out the best in transit projects and has a tremendous array of benefits to offer Detroit. In many ways, this small transit project is the little engine that could.

dettransit_mapBoiling M-1 Rail down to its lowest common denominator, this project is a very small but vitally important link that ties together a regional rail network that is finally coming together. M-1 Rail, spanning the Cass Corridor between downtown (served by the very cool and very retro People Mover) and New Center (where Amtrak’s Wolverine and SEMCOG’s commuter system cut through Detroit City), is a 3.3-mile link (red) between these two existing (blue) transit systems that don’t currently intersect.

Now, given that there are some interesting corridors in the rift left by these two systems, doesn’t it make a lot of sense to connect the closest points of these two disparate transit networks? Even without knowing much about Detroit and specifically the neighborhoods that lie between the two transit systems, it would seem to make sense within the regional context: By making that connection, rather than having three disparate transit systems, you now have a single whole network that serves the Detroit region.

b99329484z-1_20151130190435_000_gvcmn04b-1-0It so happens that besides the obvious slam dunk within the regional context, that the localized context further propels the case for M-1 Rail. Woodward Avenue, Michigan Highway #1, is America’s only urban national scenic byway. There are only 30 national scenic byways. Step aside Euclid Avenue (CLE), High Street (Cbus), Wash Ave (STL), Fifth and Forbes (Pitt), Vine Street (Cincy). Woodward Avenue is the granddaddy of all of the great urban main streets.

I have a lot of “crazy theories” one might say, and one of them is that you can usually go up to a tall vantage point and look out over a major city and either point out specific transit corridors, or what should be specific transit corridors. Go to the CN Tower and you can literally see the veins of high-rises that fan out across the city, most notably along Yonge Street, where towers rise up for a dozen or so miles from the low-rise scale of Toronto’s surrounding neighborhoods. In a city without rail, the same experiment is basically a quick-and-dirty method of studying prospective corridors. In Columbus, go to the Rhodes Tower observation floor, and even if you know nothing about Columbus you still can’t help but notice how the entire city literally rises up at High Street. Similarly with Detroit, go up to a tall building on Wayne State’s campus and then look out over the city. You will see the above view. If you were struggling with where to do transit three years ago, the above view would be somewhat illuminating.

The financing of M-1 Rail is the most interesting urban experiment I have ever seen. Detroit City is in fact kind of an outsider to this entire project. This project has been planned, approved, and implemented by a complex partnership between Detroit’s non-profit sector and the federal government, which literally “required an Act of Congress” to allow public-private partnerships to count as the local match required by FTA. It also leverages New Markets Tax Credits, which is the first time NMTC’s have ever invested in public transit, thanks to LISC, Great Lakes Capital, and others. Four foundations, including the Ford and Kresge foundations, also contributed millions. Detroit’s corporate community stepped up to the plate to buy naming rights at each station, contributing far more than a name is really worth.

The financial pieces (totaling $180 million) of this project are as follows, mostly in little $3 million chunks here and there:

  • Kresge Foundation – $49.6 million
  • FTA TIGER I grant – $25 million
  • FTA TIGER VI grant – $12.2 million
  • Quicken Loans – $10 million
  • State of Michigan – $10 million
  • Detroit Downtown Development Authority – $9 million
  • NMTC (LISC, Great Lakes Capital, etc) – $8 million
  • Penske Corp. – $7 million
  • MEDC – $7 million
  • Illitch Holdings (Little Caesar’s Pizza) – $6 million
  • Ford Foundation – $4 million
  • Blue Cross Blue Shield of Michigan – $3 million
  • Chrysler Foundation – $3 million
  • Detroit Medical Center – $3 million
  • General Motors Co. – $3 million
  • Henry Ford Health System – $3 million
  • Wayne State University – $3 million
  • Wayne County – $3 million
  • Ford Motor Co. – $3 million
  • DTE Energy – $2.9 million in-kind
  • Compuware Corp. – $1.5 million
  • J.P. Morgan Chase – $1.5 million
  • Hudson-Webber Foundation $1 million
  • Bank of America Foundation – $300,000
  • Ford Motor Co. Fund – $100,000

Notice you won’t see “City of Detroit” anywhere on said list. Nor will you see “taxpayers of Detroit” on the list, in any way (through some taxing district, etc). I just think that this is amazing. At a minimum, it’s a testament that the Rust Belt community ethos is alive and well in Michigan, even after a community has broken down and weathered such a storm. 

At this point I must confess that I started out intending to just whip up another quick photo tour and press “publish.” While that is still forthcoming, I just can’t stress enough that with this transit project the devil is in the details. If you bother to look at these details, it really is the coolest transit project in America.

And it is becoming reality.

Progress as of January 2015:

Progress as of February 2016:

Which eventually will resemble these renderings:

So, if you like what you see, mark your calendars for sometime in 2017 when M-1 Rail leaves the station, revolutionizing how visitors (tourists and suburbanites alike) will experience Detroit City. It will be an experience that keeps people coming back and hopefully creates enough concentrated activity to rub off on the less-revitalized remainder of the city.

Rather than insist that every project solve every problem (zero-sum), M-1 Rail is worthy of our support and admiration as a singular solution in a city that collectively needs a lot of singular solutions. M-1 Rail doesn’t fix everything overnight; however, it does fill in the missing link, build on Detroit’s existing assets, connect the city to the broader region where most jobs have moved, and give the city something captivating to build on for the future.